5m Biogas plant
Seychelles
Details

- To better understand technical elements of AD plant design for maximum biogas production
- To produce sufficient biogas to test biogas equipment e.g. scrubbing system and a modified
- LPG cooker
- To produce biogas for compression into CBG
- Very fast to construct and put together
- Needed a crane to lift and put in position
- Took more than 5 hours to fill with water for startup
- Require more time and feedstock to get going
- Have caps on the outlet so digestate can be controlled
- Large biogas plants not suited for homes in Seychelles due to space requirements
- Large volume require a lot more feedsctock and innoculation to start
- Long term viability is being assessed